The MOVAX piling hammers can be mounted directly onto the excavator (stick), onto MOVAX Multi-tool piling leader, or a third-party piling rig or crane.
Each mounting option requires its own mounting bracket (except crane-mounting which do not require a mounting bracket).
The top cover is the same for the excavator- and multi-tool piling leader (MPL)- mounted DH piling hammer. When mounting the DH on a third party piling rig or on a crane a top cover with lifting lugs is required.
The lower frame is the same for the excavator-, multi-tool piling leader (MPL)- and piling rig-mounted DH piling hammer. The crane-mounted piling hammer is equipped with a pile sleeve (“bell”) with pile guides available separately for tubular steel piles and sheet piles.